Mavuno Church
Electrical wiring of the church including the church compound, street lighting and outdoor lighting networks.
AFD Phase II – LOT 3 MOE Rural Electrification contract ( Coast Province).
Construction and Installation of 5 scheme projects totaling; 33KV -90 Kms, 11 KV – 31 Kms, 433 V LV- 28Kms and 28 Transformers. The projects were completed on 30thAugust 2009. 780,000
AAFD Phase II – LOT 3 MOE Rural Electrification contract ( Central Province).
Construction and Installation of 13 scheme projects totaling; 11 KV -31 Kms, 433 V LV- 12 Kms and 12 Transformers. The projects were completed on 30thMay 2011.
Athi River 23 MVA, 10 MVA,66/33 and 66/11 KV Substation.
Electrical installation for all the station equipment including, transformer, 66 KV CBs, 66 KV CTS, 66 KV VTS, Busbars and Steel Structures, 11 KV Switch boards, SCADA Panels, Control and protection panels. The Project was completed 15-11-2009. Main Contractor Areva-Alstom
Ruaraka 132KV/ 66KV/11 KV Station.
Electrical installation for all the station equipment including, transformer, 66 KV CBs, 66 KV CTS, 66 KV VTS, Busbars and Steel Structures, 11 KV Switch boards, SCADA Panels, Control and protection panels. The project was cancelled halfway for re-tendering when the main Subcontractor was terminated. Main Contractor Areva-Alstom
Kitsuru Substataion.
Erection and installation of 11 KV switchboard, cabling and associated equipments. The project was completed 28-2-2010. Main Contractor Areva-Alstom
Olkaria II Unit 03 Extention- Geothermal power plant.
The project involves commissioning the additional 220 KV Bay for the third 40 MW machine. The project was completed in November 2009. Main Contractor H Young
Rural Electrification
33 KV and 11 KV Distribution lines including distribution transformers contracted by Rural Electrification Authority REA.
Financial and technical Consultancy for GPOBA
Financial and technical Consultancy for Electrification in People Settlement areas starting with kibera (GPOBA). The Consultancy was contracted by the World Bank.
Airport 2 bay by 23 MVA, 66/11 KV Substation.
Civil and Electrical installation for all the station equipment including, 66 KV CBs, 66 KV CTS, 66 KV VTS, 66 KV SA, Gantries, Busbars and Steel Structures, 11 KV Switch boards Panels, SCADA Panels, Control and protection panels, Equipment Building, Equipment Foundations, Cable trenches and Access roads. Main Contractor Siemens
Limuru 3 bay by 23 MVA, 66/11 KV Substation.
Civil and Electrical installation for all the station equipment including, 66 KV CBs, 66 KV CTS, 66 KV VTS, 66 KV SA, Gantries, Busbars and Steel Structures, 11 KV Switch boards Panels, SCADA Panels, Control and protection panels, Equipment Building, Equipment Foundations, Cable trenches and Access roads and Drains. Main Contractor Siemens
Donholm 11KV Substation
Construction of equipment building, 11 KV Indoor Switchgear, SCADA Panels, AC and DC Systems including Batteries and charger. Main Contractor Siemens.
Kangema and Githambo Substations.
23 Kms of 33Kv and 11Kv lines in concrete poles at Kangema and Githambo Substations. Main contractor is KEC Limited.